Emergency lighting inspection checklist
Inspection checklist for the installation of emergency lighting system Make sure that the emergency lights are firmly mounted and not loose. Check the wiring to
Inspection checklist for FM 200 and Deluge System
Inspection checklist for Installation Of FM 200 Fire Suppression & Deluge System Installation of a deluge system must be carefully planned in order to ensure
Inspection checklist for the installation of fire rated ducts
This inspection checklist will help to ensure that the job is done right, and that your fire rated ducts are installed correctly.

Inspection Checklist for GI Ducts Installation
Inspection Checklist For GI Ducts Installation In order for a GI duct installation to be effective, a number of factors must be taken into account

Commissioning of Light Fittings & Fixtures
This Work Method Statement (WMS) is to ensure installation of light fittings and fixturesis correct and as per agreed procedures and that working of the fixtures is correct and as per client requirements and to check is work is carried out as per the regulations.