Installation of FM 200 Fire Suppression & Deluge System
This Method Statement defines the procedures to be followed for the supply and Installation of Installation of Fire Suppression System [FM 200 & Deluge System].

Inspection Checklist for Chemical Cleaning of Chilled Water Pipes
This Inspection checklist describes/ defines the procedures involved in Chemical Cleaning Of CHWP System

Method Statement for the Testing and Commissioning of FM 200
This Method Statement describes/defines the procedures involved in the Testing, Commissioning of Fire Fighting System FM 200 to confirm proper operation.

Inspection Checklist for The Installation Of HVAC Ductworks
Read about: Method Statement For The Installation Of HVAC Duct Works. INSPECTION POINT Sub-Contractor Consultant REMARKS Site Eng QC 1 Check the pre-fabricated ductwork sizes

Method Statement for the Installation of Chilled Water Pipes
This Method Statement defines the procedures to be followed for the Erection of Chilled Water Pipes and fittings.

Installation of Dx Split Units
This method statement describes/ defines the procedures involved in Installation of HVAC System such as Dx Split Units in order to confirm proper operation.