Inspection Checklist for The Installation Of Chilled Water Piping System

Inspection Checklist For The Installation Of Chilled Water Piping System CHWP

Inspection Check List for The Installation Of Chilled Water Piping System

INSPECTION POINT

 

 

Contractor

 

  Sub-Contractor

 

REMARKS

Site Eng

QC

1

Inspection is as per the approved Shop Drawings.

 

 

 

 

2

Materials used are as per approved Material Submittal

 

 

 

 

3

Space of supports are as per the specifications, approved shop drawing

 

 

 

 

4

Additional supports provided in every change of direction

 

 

 

 

5

Sleeves are provided wherever pipes crosses walls and slabs

 

 

 

 

6

Coordination  with other trades is taken cared of avoiding unnecessary clashes

 

 

 

 

7

Rubber inserts in between pipes and clamps are used.

 

 

 

 

8

Threaded rods used as supports have correct sizes, cut ends galvanize painted and cut with sufficient lentgth

 

 

 

 

10

Supports used are independent form other trades, no sharing of supports

 

 

 

 

11

Approved Labeling materials are provided

 

 

 

 

 

 

 

 

 

 

COMMENTS:

 

 

 

 

 

 

 

SUB-CONTRACTOR

ENGINEERS

Contractor

SITE ENGINEER

QUALITY ENGINEER

Name:

 

 

 

 

 

Signature:

 

 

 

 

0/5 (0 Reviews)

Share:

Facebook
Twitter
LinkedIn
Pinterest
Tumblr
WhatsApp
Hira B

Hira B

I have done BS Electrical Engineering and Masters in Construction Management with 8+ years of working experience in UAE and Singapore. I lost my job in early 2020 during Pandemic and since then working as a Freelancer.

We are working to add more content on daily basis, Our site is free for everyone. Support our efforts with a contribution of any size.

More Posts

Send Us A Message

You cannot copy content of this page