INSPECTION POINT |
Sub-Contractor | Contractor |
Main-Contractor |
REMARKS | ||
Site Eng | QC | |||||
1 | Installation is as per approved Shop drawing |
|
|
|
|
|
2 | Materials are as per approved material submittal and are new. |
|
|
|
|
|
3 | No damages to the installations, equipment, components and all cablings are properly supported or cable tied. |
|
|
|
|
|
4 | Cable continuity is and insulation integrity is maintained. |
|
|
|
|
|
5 | Riser cables are provided with approved means of support/ ties to avoid excessive stress to the said cables. |
|
|
|
|
|
6 | Proper cable dressings at the trunkings are carried out. |
|
|
|
|
|
7 | Labels/ tags are provided with approved materials |
|
|
|
|
|
8 | All system interfaces with fire alarm system for control and monitoring are configured properly |
|
|
|
|
|
9 | All installations where required are coordinated and follow reflected ceiling plans |
|
|
|
|
|
10 | Mounting height requirements are for all devices, components are followed. |
|
|
|
|
|
11 | Installation is clean, and paints without scratches. |
|
|
|
|
|
COMMENTS: | ||||||
| ||||||
| ||||||
| ||||||
|
| SUB-CONTRACTOR | Contractor | Main-Contractor | |
SITE ENGINEER | QUALITY ENGINEER | |||
Name: |
|
|
|
|
Signature: |
|
|
|
|