INSPECTION POINT |
Sub-Contractor | Main Contractor |
Contractor |
REMARKS | ||
Site Eng | QC | |||||
1 | Installation is as per approved shop drawings. |
|
|
|
|
|
2 | Materials used are as per approved material submittal. |
|
|
|
|
|
3 | Manufacturers’ installation recommendations are followed. |
|
|
|
|
|
4 | No damages incurred on the material. |
|
|
|
|
|
5 | All connection materials are as per approved material submittal. |
|
|
|
|
|
6 | Connections are tight to maintain good continuity |
|
|
|
|
|
7 | Supports are provided as per the approved shop drawing |
|
|
|
|
|
8 | Approved tagging / labeling materials are installed at the designated areas. |
|
|
|
|
|
9 | Earth conductor color coding, sizes are correct |
|
|
|
|
|
10 | Continuity is ensured and resistance is within approved limits |
|
|
|
|
|
|
|
|
|
|
| |
COMMENTS: | ||||||
| ||||||
| ||||||
| ||||||
| ||||||
| ||||||
|
| SUB-CONTRACTOR | Main Contractor | Contractor | |
SITE ENGINEER | QUALITY ENGINEER | |||
Name: |
|
|
|
|
Signature: |
|
|
|
|