Inspection Check List for The Installation Of Earthing & Lightning Protection

INSPECTION CHECK LIST FOR THE INSTALLATION OF EARTHING & LIGHTNING PROTECTION SYSTEM

INSPECTION POINT

 

Sub-Contractor

Main Contractor

 

Contractor

 

REMARKS

Site Eng

QC

1

Installation is as per approved shop drawings.

 

 

 

 

 

2

Materials used are as per approved material submittal.

 

 

 

 

 

3

Manufacturers’ installation recommendations are followed.

 

 

 

 

 

4

No damages incurred on the material.

 

 

 

 

 

5

All connection materials are as per approved material submittal.

 

 

 

 

 

6

Connections are tight to maintain good continuity

 

 

 

 

 

7

Supports are provided as per the approved shop drawing

 

 

 

 

 

8

Approved tagging / labeling materials are installed at the designated areas.

 

 

 

 

 

9

Earth conductor color coding, sizes are correct

 

 

 

 

 

10

Continuity is ensured and resistance is within approved limits

 

 

 

 

 

 

 

 

 

 

 

COMMENTS:

 

 

 

 

 

 

 

 

 

SUB-CONTRACTOR

Main Contractor

Contractor

SITE ENGINEER

QUALITY ENGINEER

Name:

 

 

 

 

 

Signature:

 

 

 

 

0/5 (0 Reviews)

Share:

Facebook
Twitter
LinkedIn
Pinterest
Tumblr
WhatsApp
Hira B

Hira B

I have done BS Electrical Engineering and Masters in Construction Management with 8+ years of working experience in UAE and Singapore. I lost my job in early 2020 during Pandemic and since then working as a Freelancer.

We are working to add more content on daily basis, Our site is free for everyone. Support our efforts with a contribution of any size.

More Posts

Send Us A Message

You cannot copy content of this page